Reconstruction of a Doric column.
The damage is evident.
Rotted base.
Full length split.
Repairing the split.
The column was glued and clamped…
… and allowed to cure overnight.
Repairing the rot.
Abatron, a two part architectural epoxy, was applied in numerous layers to build back the missing wood.